 | The Pallet Arrives 5/25/2008 |
 | Breaking Down and Unpacking 5/25/2008 |
 | With its own Steam Generator 5/25/2008 |
 | The Base - big enough for me to lay down in 5/25/2008 |
 | Ahhh the whirlpool base 5/25/2008 |
 | Plumbing, wires, and pumps 5/25/2008 |
 | Some of the many wall panels 5/25/2008 |
 | More or less unpacked now 5/25/2008 |
 | The half bathroom wall is removed and tub leveled 5/25/2008 |
 | Ready for the next step - the shower walls 5/25/2008 |
 | Bathroom Remodel 1 11/9/2008 |
 | Bathroom Remodel 2 11/9/2008 |
 | Bathroom Remodel 3 11/9/2008 |
 | Bathroom Remodel 4 11/9/2008 |
 | Bathroom Remodel 5 11/9/2008 |