RatzNest.info

The Pallet Arrives   5/25/2008
Breaking Down and Unpacking   5/25/2008
With its own Steam Generator   5/25/2008
The Base - big enough for me to lay down in   5/25/2008
Ahhh the whirlpool base   5/25/2008
Plumbing, wires, and pumps   5/25/2008
Some of the many wall panels   5/25/2008
More or less unpacked now   5/25/2008
The half bathroom wall is removed and tub leveled   5/25/2008
Ready for the next step - the shower walls   5/25/2008
Bathroom Remodel 1   11/9/2008
Bathroom Remodel 2   11/9/2008
Bathroom Remodel 3   11/9/2008
Bathroom Remodel 4   11/9/2008
Bathroom Remodel 5   11/9/2008